Ongoing Projects


Sl.No. Name of Work L.O.A/W.O./C.A No. & Date Contract Value (In Rs.) Remarks
1 Supply & Execution of materials for S&T work for infrastructure development of Janai Road Railway station in connection for UTCL siding. i)DC/CMV/9021000127 dtd. 16.03.2016 (Supply) & ii)DC/CMC/8078000786 dtd. 16.03.2016 (Execution) 12.75 Crores Revised 16.13 Crores Work complete Waiting for NI
2 Supply & Installation of Signal with Telecom work for Railway siding pertaining to 2 x 1.2 MTPA Grinding unit at JSW Cement Ltd., Salboni JSWCL/Salboni/35 Dated 01.03.2017 4.66 Corers Revised 13 Crores Work in Progress
3 Supply, Installation, Testing and commissioning of S&T work for DOUBLING BETWEEN BASULIYA SUTAHATA STATION to BYSA JN. CABIN Till LC Gate at KM No.:56.662 from PKU including 5th Loop line at BYSA Stn. With DI alteration at BYSA Stn. And Panel Modification at BYSA Jn. & DZK Stn. W.O No.: HEL:WO:3230C Dt. 27.02.2016 5.11 Crores Work in Progress
4 Supply, Installation, Wiring, Testing & Commissioning work- of S&T Equipments for modification of In-Plant Yard to provide Additional Track Hopper and Wagon Tippler for 2x500 MW expansion of Sagardighi Thermal Power Plant (Phase-II) near Manigram Station of Malda Division in Eastern Railway, Dist. Murshidabad, West Bengal C.A. No.- RITES/RPO-KOL/WBPDCL-Sg.TPP/Phase-II/S&T/ 2015/467 Dt. 20.02.2017 2.85 Corers Work in Progress
5 Supply, installation, testing & commissioning of STM, Muxs and OFC Link & Supply, Installation, Testing & commissioning of Way station equipments, Head quarter control equipments with power supplies, Emergency sockets etc in SP/SSP/TSS including Trenching, Laying, Jointing of 6-Quad/PIJF cable for SP/SSP/TSS etc in PAKUR-MALDA & ANDAL-SITARAMPUR VIA JAMURIA-IKRA & SRIPUR Section of Eastern Railway. C.A. No. CORE/S&T/TELE/9041/PKR-MLDT & UDL-STN Dated 10.08.2015 2.26 Crores Sitarampur to Barabani Stations Commissioned Barabania to Tapshia Commissioned
6 Supply & Execution of materials for S&T work for infrastructure development of Janai Road Railway station in connection for UTCL siding. i)DC/CMV/9021000127 dtd. 16.03.2016 (Supply) & ii)DC/CMC/8078000786 dtd. 16.03.2016 (Execution) 2.43 Crores Work in Progress
7 Work of Trenching & Laying of U/G Signaling Cable/ Power Cable, Casting of Foundation, Supply of Equipments / Materials, Erection of Apparatus Cases and Fixing of Equipments and other related works including Wiring, Testing and Commissioning in connection with RE modification of existing Central / End Panel Interlocking / EI at stations, provision of MACLS / RE modification of existing MACLS at L.C. Gates to suit 25 KV AC Traction in the following sections:-
1. KATWA : AZIMGANJ SECTION OF HOWRAH DIVISION OF EASTERN RAILWAY.
2. JANGIPUR ROAD : NEW FARAKKA SECTION OF MALDA DIVISION OF EASTERN
KWAE-AZ-NFK-SIG-KKK-OT-23 dated 13.12.2017 4.14 Corers Work in Progress
8 Execution of Railway siding work consisting of earthwork in cutting, disposing of excavated soil with all lead & lifts, supply and spreading of ballast, supply of P : way materials, Laying and linking of railway track, construction of bridges, work for entire siding in In Plant siding take off from Jhakhapura station in khurda division of east cost railway for the proposed large Cement Plant at Kalinga Nagar Industrial Complex (KNIC) Villge : Mnitira under P.S Jakhpura, Back Side of Maithan Steel, Tehsil Danagadi, Dist Jajpur, Odisha : 755019 ECL/Odisha/LOI/Railway/HO/17 :: 18/001 dated 19.12.2017 28 Corers Work in Progress